Abtrac Support
  • Remote Access
    • Windows Remote Support
    • Mac Remote Support
  • Abtrac Support
  • Abtrac Login ➜
  1. Home
  2. Knowledge Base
  3. Time & Cost
  4. Timesheets
Searching...

Timesheets

  • At work (an accurate measure of productive time)

    In Abtrac most projects are At Work, but you can optionally select projects like sick leave, annual leave, professional development as Not At Work - to measure productivity only on time spent on 'real work'
  • Tracking break time for projects in timesheets

    You can manage breaks in Abtrac by either skipping them entirely and logging only work timesheet lines, or by explicitly entering break time — typically against a non-billable project, or carefully within a billable project.
  • Using Activities in timesheets

    This article explains how activities in Abtrac timesheets define the type of work being done, such as drafting, meetings, or travel. It covers creating and organising activities, limiting them by project or task, and how activity settings affect charge rates, helping ensure consistent time recording and accurate billing.
Prev
© 2026 Abtrac. All rights reserved. "Abtrac" is a registered trademark of Above Board Computer Consulting Ltd.
  • Legal
  • Privacy
  • Contact Support
  • Support Articles